Hi There,
Love the expertise and forum, super useful and greatly appreciated
I'm looking to pour a suspended slab.
100-120mm thick and 5m x 2.7m, suspended ~300mm off the ground with a double brick perimeter on all 4 sides bar a 400mm opening. I've poured a number of slabs and am confident in the process when pouring against a compacted base, however, the question I cant seem to solve;
Setting up the formwork will require a base. What is best to use for the base material, ideally that you can leave in place post curing?
Can I use formply and leave it after the concrete is set? (removing would be super hard)
Or
Am I better to use some corrugated sheeting to better stand the test of time and remain as a premanent base?
I have seen Deckform as product however seems overkill/commercial for my purpose
Drawing attach of the bricked area (and no, i didnt have a ruler or eraser handy, soz)
Thanks
Brayden