After waiting for a spot in our contractors chaotic schedule we realised it wasn’t going to happen in the time frame we wanted. The timber that was ordered is F14 cypress 150x200mm in a 3.3m length, held up by 2 f14 150x150 posts.
mas per the picture we are replacing 3 studs to take out a half wall.
Can we be confident this beam is sufficient? There are piers below the house.
picture is pre asbestos wall removal, with the 2 panels being wall to remove.