Hi Community
we have are in the middle of a tiling project where we will lay new tiles ( 20 x 120cms) on a concrete patio in a stretcher bond pattern (as shown on picture 2 on upper slab which 2.5 x 2.5m) .
The lower slab concrete patio will follow the same pattern as the upper slab and is ~ 4x8 meters
I m have been wondering about expansion joints and how far this would be required for the lower slab (not planning for upper slab) -any advice ?