We have a walk through gap/passage way which we want to fill in. Size 2060 high x 1490 wide.
There is a plasterboard wall either side which is 125mm deep/thick.
I'm going to use 10mm Gyprock plasterboard on both sides, flush with the original on both sides.
If I use 90mm framing timber for the header/footer boards, studs and noggin, how do I pack out the extra space so that the new plasterboard is flush with the original? Are there specific packing strips that you put onto the frame before applying the stud adhesive? I couldn't find anything suitable on the Bunnings website. Thank-you.