There was a waterleak in the upstairs shower... The 2 layers of tiles have been taken up and the water damage traced and taken out.
The repaired section of the floor is slightly lower than the original floor so I want to know how to prepare the floor (so it is ready) to add a custom built base (yet to be ordered)
I am aware that waterproofing is essential and am adding timber to all the sides to help form "the tub"
Next after the timber sides will be cement sheet (which will be waterproofed)
Is it important to get the floor completely level or will the cement slurry provide the necessary base (after waterproofing?