I'm planning the following renovations and will project manage myself, though will employ professionals (if I can get them!). I don't mind a bit of disruption and half-done-reno between tradies. The reno is for a new kitchen, laundry and flooring of the ground floor of a 1990's townhouse which comprises a loungeroom, kitchen/dining and laundry.
Can anyone suggest what order should these steps be done in?
1. Knock down partition wall between kitchen and laundry.
2. Repair wall and ceiling between kitchen and laundry.
3. Remove flooring in lounge/kitchen/dining (tiles and floating floorboards)
4. Remove kitchen (sink not moving)
5. Install bottled gas for new gas cooktop (previously electric).
6. Plumbing for laundry (sink not moving, washing machine taps need to move)
7. Install new kitchen/laundry.
8. Install new flooring (same floating floorboards throughout)
Very grateful for your advice! @Adam_W @ProjectPete @MitchellMc
Ari