I want to run steps up to a 1.6M high deck. I like the look of these black "Peak" stringers, but Peak do not make the 7-step that I would need. I'm considering putting in a post /lintel and running the 5-step from it up to the deck. I would then bolt the 2-step to the bottom riser of the 5-step and the bottom of the 2-step would be bolted into a concrete pad at the base.
Are there any issues I've missed? Has anybody done this? Thanks in advance for any contributions.

with 1.2M treads