Starting with this
66 x 42mm 5.4m Baluster Bottom Rail H3 Pink Pine FJ Primed EBR4 LOSP
I have an existing railing but it looks like it is installed wrongly. The bottom rail is clearly a sill to allow water to drain outwards. But how are you supposed to attach the vertical strips of wood. It must be obvious or there’d be instructions somewhere but it’s not obvious to me. My installation has a horizontal bit of wood on the outside effectively blocking the water escaping. That has to be wrong. It’s also falling to bits.