
We are renovating our old kitchen after water damage, keeping plumbing in same position but with some additional electrical (new power point for a dishwasher under the window and we are switching from a freestanding stove/oven combo on the far wall to a separate built in oven and induction stove). The electrical and plumbing will be done by professionals of course, but we want to resheet the gyprock walls ourselves and I'm not sure whether to do that before or after electrical cabling works? We think the far wall could just be plastered smooth but the window wall will need to have a new sheet laid. Thanks!