Hi - I’ve had new copper pipes, PVC drain pipe and electrical cables chased into the brick wall of my bathroom that I’m renovating. I can’t find a straight answer about whether it’s best to add a covering before rendering or rendering straight over the pipes/cables. I’ve read that cement (in the rendering mix) can be corrosive to certain materials. There is also a big space where the PVC drain pipe was added so it’ll be hard to add render without something filling the space.
I’ve added some photos below. Any advice would be greatly appreciated!


