Hi! I'm looking for advice for mounting a track curtain to a concrete ceiling in my unit. The building is an 80's double-brick construction with concrete slab ceiling and substrate and we have 1 unit above us. I would need to drill about 40mm into the ceiling to install about 6 brackets evenly across the width (red line in image indicating the placement). Having never drilled into the ceiling previously, is there anything I should look out for or issues that could arise? Is it likely I would encounter rebar or conduit at that depth?
Any advice would be amazing!
Thanks,
Mitch
