Hello,
I just had a concrete slab laid in preparation for installing a 4.5m x 1.5m Build-a-Shed that I purchased from Bunnings. What is the suggested number of days to wait (from the concrete pour date) before I should construct the shed (i.e. drilling holes in concretes for the shed bolts)? I have read various timeframes on several forums. The most common advice is to wait roughly one week, that would be sufficient. Although not 100% cured, it is sufficient enough for the purpose of installing the shed.
Any further advice would be appreciated.