What should be used to cover the waste stack down pipe in my kitchen before adding a cupboard and tiling.
After being paid, The kitchen installer has left the job. I don’t think he’ll return when the additional cupboard arrives. 🙁 so need to figure out how to do this myself, with any help here.

