Materials
Bathtub
floor tiles
marble wall tiles
shower screen
Bunnings wall mirror above vanity
Bunnings Mondella bath tapware and vanity tapware
Bunnings shower head Mondella
Bunnings hand shower head
Tools
Tile cutter
trowels and hammer
nail gun
dulux paint
Steps
Step 1
Gutted the old bathroom
Repaired any floorboards or studs
Built new wall and covered old doorway with new frame and window frame altered
Electrician and plumber completed works
Insulation, wet area gyprock installed
Bath installed
tiling and grouting
painting
fixtures installed including shower head, tapware, vanity etc.
original 1960s bathroom
Original bathtub and shower