Steps
Step 1
Dug out existing trees and shrubs, and removed concrete garden edging

Step 2
Dad built the deck over the existing concrete and before the french doors were put in.


Step 3
Painted fence & hired concrete cutter from Kennards to cut concrete on both sides of deck and sledge hammered concrete out.

Step 4
French doors installed and shovelled 6 cubic square meters of top soil to level out ground. Reconfigured and moved existing retic pipes to suit new garden layout. Hedge planting started.

Step 5
Dad built two steps for deck. Corten steel retaining wall and edging installed, levelled out top soil and lay turf. Hedge planting on front boundary


Step 6
Stone pavers, Native plants, mulch and boundary steel edging installed.