I am considering DIY retaining walls for altogether up to around 60-70 metres on my new property. One thing that makes me worry is potential damage on existing pipe to stormwater system under the ground while using an auger.. How do you avoid this issue? My builder told me that they can’t pinpoint where the pipes are accurately as the design in the building permit is a guidance. Thanks!