Hello all!
I am shortly looking at doing my front yard landscaping. My site plans indicate a "batter" is required as there is a slight slope from the house pad to the boundary. From what I can tell, the batter is indicated around 1.5m from the paving.
It is approximately a 6% decline in total from paving to boundary.
I have moderately reactive clay soil and have already noticed some movement.
My question is, does battering = retaining?
It is quite a small yard.
This is current (minus the weeds, they are gone)

Would I be looking at doing something like this?

or just a post and sleeper retaining at around the 1.5m out?
I would like to keep paths on either side for convience.
I hope this all makes sense!