I've just had an internal 75 mm thick stud wall built in garage under a steel beam for a second bathroom.
I need to attach a second frame as the beam is still protruding another 60 mm out, my thought is to use 90 mm studs nailing to existing studs and when I reach the beam, to cut 60 mm in to go around the beam,


leaving a 30 mm stud to continue to the ceiling for plastering.
My concern is that this may effect the integrity & strength of the wall.
I will be tiling a shower there, thanks Leigh