Hello experts,
I am looking to do decking project (3.8m *5.7m ) to transform my back yard. The deck runs across concrete and the soil and the major portion lies on concrete. Attached is the plan of it.
Height difference between the concrete slab and the bricks under exist door is 60mm. How to achieve framing (driinage , strength etc ) in this low clearance situation ?

