Hi folks, I want to replace my old toilet with a new rimless one and redo the floor with hybrid flooring at the same time. I did some research and most of them advised doing the floor first then toilet. But they do not specifically mention hybrid floor. And I'm not sure if a toilet can be safely secured on top of floating floor boards.
This is the new toilet I'm looking at Mondella back to wall . The old floor used to be tiles, then coated with epoxy. Now I'll be doing a 5.5mm SPC floor on top of that. Should I install the hybrid floor first or should I install the new toilet on the current tile/epoxy floor, then work my way around the toilet for the hybrid flooring? Thank you!