Hi guys
I'm revisiting shower floor remodelling ideas. One of our showers is a curbless open shower. The rest of the bathroom has a bathtub and vanity+walkway. To contain water within the shower area, I'm considering a shower tray. One contractor suggested replacing floor tiles of shower area & the bottom row of wall tiles rather than ripping out all floor tiles of entire bathroom. I'm just wondering when they install new waterproof membrane before replacing the tiles, how would they be able to overlap with the old membrane of the rest of the bathroom area?
Thanks in advance