Hi there,
we are going to start our courtyard area and trying to work out levels. Our house was built slightly below street level so trying to keep it as high as possible. We have marked out string lines with a 1cm fall per meter and as you can see by the picture this still doesn’t bring us to the bottom of our neighbours fence. I want to raise this more but the garage step down entrance won’t allow for this. My question is, would we be able to keep the garage level for the first meter or 2 on the patio (ensuring it drains away from the house) and then step up the rest of the patio? Would this be compliant in Victoria? Or is this just a bad idea?