Hello Brains Trust,
I am in the process of construction a sub floor as i need to raise my garage to create a work from home salon space covering will be floating floors 5mm wet area .
Council have instructed we need to bring the floor up 50mm
current process was to
1) use VBS rapid to paint surface first
2) lay h3 treated pine 90x35 the length of garage with 450mm spacings then add noggings *** Glue and then bolt into concrete ( bolts haven't yet decided but I will counter sink them)
3) then paint tops then glue and screw structural ply
4) lay hybrid planks 5mm