I am working out my shopping list to install new bathroom flooring. Currently it has yellow tongue subfloor (previously covered by looselay vinyl sheet). I want to install cement sheet underlay over the subfloor, then prime, then use self-adhesive vinyl planks.
What direction should the cement sheet and planks be layed? What transition strip do I install at the doorway? What type of floor waste/grate do I need as before the vinyl covered the pipe?
