Hi there, I’m doing up the smallest room and the floor bulges up slightly towards the toilet. It’s not damp and seems fine. Should I just level the floor and get a plumber to install the new toilet? Or should I get a plumber to look at it before installing the new toilet? Also what order should I do things? Should I install a new floor first or do the toilet first? Cheers!
