Hi All, i am building new deck in the backyard Work completed; concrete post at a distance of 2 meter each side ..deck area around 5 X 5 meter.
i just came to know now from the forum that the posts are required for every under 1.8meter. I am building deck first time.. is it okey to put some tuffblocks as i am over 1.8 meter rules for post.
Also posts and joist are not leveling pretty much. what is the best way to level when i start putting composite deck . is there any packing available for me to put on the timber to level up. Sorry i am builing this forst time and was not aware of all rules.
Thank you in advance.