Hey Bunnings Crew,
I’m looking to begin paving a path and small alfresco area on my new build. Just wanted to check to see I’ve got my heights right before I put down my DPC and then go ahead with my roadbase.
How it stands, I’ve dug out a depth of 200mm to allow for the following:
-DPC
-75mm Road Base
-30mm Bedding Sand
-40mm thick paver
-50mm breathing space
The DPC should come up to roughly 150mm after it has been trimmed which should go about my pavers but allow for the breathing space in the foundation.
I’m finding the paperwork I’ve been given not ultra clear but to my current interpretation this is what I’ve got planned at this stage.
How does this all look or am I will I need to get back on the shovel?
My only other question is around the paving of the alfresco area. I’ll be paving on top of the slab so the depth is a lot lower. Current plan here is to still lay the DPC and then just put down less road base as the slab is already solid? I’ve got about 150mm of working space here so working on my above calculations it’d be 25mm of road base through the alfresco.
All responses are appreciated, cheers!