Hi everyone,
I’m after some advice on building a low composite deck and would really appreciate a second set of eyes before I start.
Project Overview:
-
Deck type: Composite decking
-
Total area: ~14.8 m²
-
Height: Less than 400 mm off the ground
-
Deck board thickness: 24 mm
-
Joists & beams: 45 × 140 mm H3 treated pine
-
Supports: Tuff Blocks (under the beams)
Based on my calculations, the deck structure will be around 354 mm high, assuming the Tuff Blocks raise the beams by 50 mm.
I’ve created a SketchUp model where the squares represent the Tuff Blocks (attached for reference).



What Resources I have:
My Questions:
Deck Height:
Because I need the deck to finish at a specific height relative to my back door, what is the best way to establish my starting point?
I understand the theory of measuring down from the finished deck height (deck boards + joists + beams + Tuff Blocks = ~354 mm), but I’d appreciate guidance on:
Base for Tuff Blocks
In the attached photo, you’ll see the existing crushed rock base.
-
If I compact this thoroughly using a hand tamper, is that sufficient for laying the Tuff Blocks?
-
Would you recommend adding more crushed rock or using a plate compactor instead?


Ledger:
I’m planning to use two ledgers on the house:
My thinking is that this will:
I’ve attached a photo showing how I’m imagining the ledgers stacked.
-
Is this approach sound?
-
What’s the correct way to waterproof and flash the ledgers against a brick veneer wall?
-
Should there be a gap, membrane, or flashing detail I need to include?
-
What screws or anchors should I use to fix the ledger to a brick veneer house?
-
Given that the deck is still supported by Tuff Blocks on that side, what fixings are appropriate?

Joists + Beams:
-
At corners (e.g. where a ledger meets an end joist or perimeter beam), should I be using:
-
Angle brackets?
-
Structural screws only?
-
Are there recommended fixings for these junctions?
I’ve attached a photo showing an example of where these members intersect.

Thanks so much in advance! I’m trying to plan this properly before I start cutting timber. Any advice is appreciated!