Hi, I'm ready to waterproof my shower area after demo of the old tiles. The floor has been screeded and is ready however I need to wait for some pipework for the shower before the walls will be ready. I have the Bastion wet area product. Do I need to waterproof the whole area in one go, or can I do the floor and wall to about knee height now, then do the rest of the walls later - ensuring to overlap the later coat over the earlier? Thanks