Hi I have a major bathroom problem. Bath has dropped several inches from original position. Several tiles from around bath have dislodged. Rest of floor and walls toilet and sink ok. Can I replace the bath with a shower (having repaired floor underneath) without requiring the whole bathroom to be demolished ? What is the cheapest way to do this through a project management approach? $$ are scarce