Hi, I have a concrete pathway getting put in soon which will be poured around an existing downpipe.
The adaptor at the base of the dp is cracked and I’d like to replace it before concrete goes in.
Questions:
- do I need to replace both the adaptor and the stormflex component that the adaptor fits into? If so, what’s the process for this?
- What height/position should I leave the adaptor for them to concrete up to? As in, do I need to have the bottom of the adaptor sitting higher so that it is above finished slab level? Also noting I’ll be putting tiles down on the slab later
Thank you 🙏