Hey Folks, I've got a concrete path that's lifted because of tree roots. Just wondering if there's a cheat/short term fix (ie less expensive) where I could grind down the main bit that's lifted? Doesn't have to be perfect just less of a trip hazard.
Could i maybe use a sledge hammer to knock off some of it then buy or hire a grinder with a diamond thing on it to smooth it down a bit? Or is that just too much height to do that? at it's highest point on the corner there it's about 50mm above the other slab of concrete.
I wouldn't need it to be perfectly 'flat', can still have a bulge, just try and make it less of a trip hazard where the 'cliff face' is. Thoughts?