Hi, I have rust along the bottom of garage wall cladding, but want to avoid replacing the whole sheets if possible. I was thinking of cutting below the fixings about 1.5m up, and sliding in a 1.6m sheet behind, leaving an overlap. Are there any major problems with that approach? Picture Shows worst of the rust, alongside a just poured slab for a water-tank, so want to at least repair these before the tank goes in.