Hi guys,
Due to an unfortunate plumbing situation, my plumber could not lower the waste trap for the new shower any further into the floor, so the shower floor will have to be raised approx 80mm, possibly up to 100mm to get the right fall to a tiled strip drain.
This will all be behind a brick hob and nib walls, so was wondering what is the best way to do this?
Using a 80-100mm thick screeded slab? Or should I build a timber subfloor frame and sheet with villaboard?
If I should frame it:
- What timber would you use given the timber will be sitting on a second story concrete slab? Is rising damp an issue in a second story slab?
- What layout should I use for the timber? A standard box/ladder frame configuration?
- How would you fix the timber frame to the slab?
- How would I ensure the villaboard sheeting has the correct fall to the drain?
- What thickness villaboard should I use for sheeting?
Cheers for any advice.