Hi Bunnings team! I have had tiles pulled up in 2 bedrooms and had hoped to have a grind and polyurethane seal performed on the old concrete floor, however the tradie said there is a bit of damp so the polyurethane would fail. The floor is also not quite flat. I am now thinking of getting hybrid flooring but want to confirm the process required to prep the floor. From what I have read, I need to place a damp-proof barrier (would love recommendatuons for the most suitable product as there seems to be heaps on the market), then prime the floor and have self-levelling concrete applied before installing the hybrid flooring. Does this sound correct? I've also read, as an alternative to hybrid flooring, that sealing the floor-levelling compound can actually look pretty good as a finished floor (would use rugs to add warmth) - any thoughts on this? Sooo many questions!