As a part of my rat rod build I plan to make myself a H frame lifting gantry and concrete the posts into the ground.
I can have a guy come and bore the 2 x 500mm diameter holes and I'm wondering going by the H frame layout how deep would be suitable to concrete in the posts. Before the frame posts go into the ground I'll add steel X supports on the bottoms and after the H frame is upright I'll weld on 2 support poles to each side and concrete them into the ground.
I've had a look on the tape and was thinking 1 meter but that's a deep hole and also a lot of concrete.