The project:
Complete renovation of our toilet after original toilet (20 years) to include total gutting of the room to bare walls and floor tiles. We then re-tiled, installed a new toilet, painted and added paneling. Finished with shutters and decorative furnishings
- Materials:
Caroma Toilet Suite, paneling, molding, painted walls and doors white, paint match to colour in tiles for paneling, easy shutters special order, square shelf set, all materials including adhesive, grout, spacers, silicone, glue and nail gun all purchased from Bunnings.
Tiles bought elsewhere
- Tools:
tile cutter, grinder, nail gun, notched trowel, all
Plumbing tools as required
Painting equipment as required
- Step 1:
stripped out old toilet and gutted room back to walls and tiles
- Step 2:
moved cold water supply from bottom feed position and repositioned for back inlet supply to cistern and reboarded
- Step 3:
Tiled Floor
- Step 4:
Painted ceiling, walls and door
Painted Paneling and
installed Paneling
- Step 5:
installation of toilet and cistern
- Step 6:
installed furnishings and window shutter