I am insulating and lining my steel shed and after advice on how to best level the ceiling so I can gyprock it.
The gable ceiling has 3 C Channels running across it. Two of these C Channels are the same size, but the one that attaches to the wall and roof is flipped the other way around meaning it is 40mm skinnier than the other two. This leaves the top hat batten floating on that end (see photo).
How do I bridge this gap so the top hats can be fixed to all three c channels and be completely level for my gyprock sheets to attach to?
Can I use a 40mm timber trip? Steel “L” brackets? Something else?
I’m currently using 22mm (0.42BMT) topspan battens and have 10mm gyprock sheets.