After 30 years in our home, our bathroom was still stuck in the 90s and in need of a complete refresh. We wanted to create a modern retreat that felt calm and relaxing. It became a true family project, with all of us working every weekend for three months, and I’m so proud of what we achieved together. Finishing it in time for our daughter to get ready for her upcoming wedding made the renovation even more meaningful, turning a long‑overdue update into something special for our whole family.
- Materials:
https://www.bunnings.com.au/full-boar-1700w-18kg-30mm-hex-demolition-hammer-kit-fbdh-1650_p0096775
https://www.bunnings.com.au/earthwool-r5-0-ceiling-batt-210mm-x-580mm-x-1160mm-7-40m-11-pack_p0810605
https://www.bunnings.com.au/stanley-fatmax-xtreme-level-2-pack-60-200cm-fmht43684-1_p0848602
https://www.bunnings.com.au/bastion-20kg-concrete-mix_p0038287
https://www.bunnings.com.au/buildex-9g-x-32mm-class-3-fibre-cement-screws-500-pack_p0920030
https://www.bunnings.com.au/crommelin-15kg-pro-500-undertile-waterproofing-membrane_p0960532
https://www.bunnings.com.au/bremick-xtp-14g-x-50mm-t40-stainless-steel-316-bugle-batten-100-pack_p0575879
https://www.bunnings.com.au/james-hardie-1350-x-2400mm-6mm-3-24m-villaboard-lining_p0714263
https://www.bunnings.com.au/james-hardie-2-88m-villaboard-lining-2400-x-1200-x-6mm_p0714174
https://www.bunnings.com.au/siniat-30-x-2400mm-90-internal-angle-plaster-trim_p0730709
https://www.bunnings.com.au/diablo-6-5-x-165mm-rebar-demon-sds-plus-hammer-drill-bit_p0719437
https://www.bunnings.com.au/kango-80mm-cold-chisel_p0472216
https://www.bunnings.com.au/citeco-kneeling-board_p0479869
https://www.bunnings.com.au/taubmans-4l-white-easycoat-prep-sealer-and-undercoat_p0401022
https://www.bunnings.com.au/dunlop-310ml-white-matte-coloured-silicone_p0612072
https://www.bunnings.com.au/ryobi-18v-one-caulking-gun-tool-only_p0385366
https://www.bunnings.com.au/gyprock-csr-20kg-jointmaster-topping-compound_p0730841
https://www.bunnings.com.au/builders-edge-50mm-x-90m-plasterboard-fibreglass-joint-tape_p0730319
https://www.bunnings.com.au/maxisil-310ml-a2-white-acetic-cure-tile-silicone_p6652851
https://www.bunnings.com.au/davco-15kg-49-light-grey-sanitized-colourgrout_p6650022
https://www.bunnings.com.au/qep-10mm-x-3-0m-gold-l-shape-angle-tile-trim_p6650065
https://www.bunnings.com.au/dta-624-x-324-x-100mm-cflex-shower-wall-recess_p6710015
https://www.bunnings.com.au/dta-420-x-360-x-100mm-cflex-shower-wall-recess_p6710014
https://www.bunnings.com.au/91-x-18mm-2-7m-meranti-colonial-architrave-skirting_p0405033
- Tools:
- Demo tools: Demolition hammer, cold chisel, tile lifter, dust masks, heavy‑duty gloves
- Cutting tools: angle grinder, circular saw, multi‑tool, masonry blade (for slab cutting)
- Framing tools: spirit level, clamps, timber screws, drill/driver
- Carpentry tools: nail gun, hammer, square, measuring tape
- Insulation & sheeting tools: utility knife, screw gun, Villaboard screws
- Surface prep tools: gap filler gun, sanding blocks, sander
- Waterproofing tools: waterproofing brush/roller, primer applicator
- Finishing tools: paint rollers, brushes, caulking gun, stain and varnish applicators
- Installation tools: silicone gun, wrench, drill bits for fixtures
- Step 1:
Demolition
We removed all existing bathroom materials to prepare for the rebuild.
- Demolished walls and tiles
- Cleared old fixtures and fittings
- Step 2:
Structural & Slab Work
We opened the slab and corrected structural issues.
- Cut through slab for new plumbing routes
- Repaired timber framing
- Straightened and levelled all walls
- Step 3:
Plumbing Relocation
We repositioned all major plumbing to suit the new layout.
- Relocated drains for vanity, shower and bath
- Ensured correct fall and drainage alignment
- Step 4:
Feature Installations
We added new functional and design features.
- Installed niches for bath and shower
- Added insulation throughout
- Upgraded ceiling fan
- Step 5:
Wall & Ceiling Preparation
We rebuilt the internal surfaces for a smooth finish.
- Installed Villaboard on walls and ceiling
- Filled gaps and sanded walls
- Step 6:
Electrical Work
We upgraded lighting and electrical fittings.
- Installed downlights
- Fitted new electrical switches
- Step 7:
Waterproofing & Base Prep
We prepared the wet areas for tiling.
- Screeded shower base
- Applied waterproofing primer
- Step 8:
Painting & Carpentry
We completed the finishing touches before tiling.
- Painted ceiling
- Waterproofed walls and floor
- Installed architraves and window frames then stained and varnished
- Step 9:
Tiling & Sealing
We installed all tiles and ensured long-term protection.
- Laid tiles throughout
- Grouted and applied grout sealer
- Step 10:
Final Fit Out
We installed all new fixtures to complete the renovation.
- Installed bath, shower fittings, taps, vanity and shaving cabinet.