Hi All,
Is anyone able to provide knowledge on the best way to cover these steel beams.
My current ideas are:
- Attach gyprock directly over them with it being nailed into the timber beam above the steal and then glued.
- Attach timber to the bottom of the steel and then that would allow me to attach the gyprock to the timber above and below the steel.
- Attach timber to either side for the Gyprock.. although this then drastically increases the thickeness of the beams.
Personally, I don’t think option 1 would work so am leaning towards option 2.
Appreciate any guidance if anyone has done this before!