The project:
This walk‑in pantry renovation replaced a small, impractical brick corner pantry with a brighter, more functional space with lots of storage. After demolishing the original structure, new timber‑framed walls were built, insulated and finished with gyprock. Kaboodle base units and open steel shelving was fitted to create organised, accessible storage. An Elite solar light now brightens the pantry throughout the day. A pocket door was fitted between the kitchen to continue the elegant appearance and close off the pantry when required. The project delivered a modern, efficient space that suits daily use far better than the original layout.
- Materials:
90 x 35mm Outdoor Framing H3 Treated Pine - 2.4m - Bunnings Australia
Gyprock CSR 2400 x 1350 x 10mm Supaceil™ Plasterboard RE 3.24sqm - Bunnings Australia
Gyprock CSR 75mm x 3600mm Cove Plaster Cornice - Bunnings Australia
Gyprock CSR 6kg Pre Mixed Cornice Cement - Bunnings Australia
Earthwool R2.5HD SoundShield Wall Batt 90mm x 430mm x 1160mm 7.0m² - 14 Pack - Bunnings Australia
Kaboodle 900mm White 3 Drawer Base Cabinet - Bunnings Australia
Kaboodle 900mm White 2 Drawer Base Cabinet - Bunnings Australia
Kaboodle 900mm Wall Cabinet - Bunnings Australia
Kaboodle 600mm White Wall Cabinet - Bunnings Australia
Kaboodle 900mm Steel Frame Wall Shelf - Bunnings Australia
Hume 2040 x 720 x 90mm Evolution CJ Flush Pull Door Cavity Unit - 720mm - Bunnings Australia
Door interior Hampton HAM1
Elite solar light
Click 6W 70mm CCT LED Downlight - Bunnings Australia
HPM EXCEL 2 Gang Wall Switch - Bunnings Australia
3000 x 1350 x 6mm 4.05sqm Duraliner Fibre Cement Liner - Bunnings Australia
- Tools:
Ryobi - 18V Rotary hammers drill
Ryobi - 18V circular saw
Ryobi - Combination mitre saw
Ryobi - 18V impact drill
Ryobi - 18V nail gun
Stanley spirit level
Gorilla ladder
Ryobi - 18V Tile saw
Cornice mitre box
Paint tray and rollers
- Step 1:
Demolition of existing pantry
- Step 2:
Finalise planning - set out including Fridge recess
- Step 3:
Installation of new framed walls and pocket door frame
Hume pocket door - 720mm wide was the perfect fit to enable easy access and not impose of the size of the fridge recess
- Step 4:
Insulation fitted to timber framed walls
- Step 5:
Gyprock new walls and fitting of skirtings
Skirting were fitted using Liquid Nails and then fitted with nail gun into timber frame of walls.
- Step 6:
Install flooring
Cement board was used to level the floor and enable the new composite floor to finish at the same height as the previous ceramic tiles.
Composite flooring in black 600 x 600 interlocking tiles was used for the floor finish.
- Step 7:
Fitting of base cabinets and wall shelving
Kaboodle base cabinets and Kaboodle open steel shelving was used for the fitout
- Step 8:
Tiling of the splashback and cabinet drawer fitout
- Step 9:
Fitting of cornicing, painting of side wall, pantry entry wall and internal wall (Pocket door).
- Step 10:
Electrical connection of new light and light switches performed by Licenced Electrician.