Hi there,
Doing a landscaping project and am up to laying the travertine crazy pave stone. I've left 40mm between slab and finish level for 20mm mortar and 20mm stone.
My mortar mix is 20kg bag cement, 4-1 sand, 1L bondcrete and some plasticiser.
Do I need to use a 20mm notched trowel for this or just a flat trowel? Do I need to butter the back of the stone? I'm going to do 1sqm at a time, do I need to put mortar everywhere on the slab? or just spot mortar where the stone is going? I'll be using a wide joint mortar from Dunlop at the end.
Here's some photos from my backyard so far