The project:
Transforming a 60sqm triple garage into a luxurious 170sqm entertainment precinct, this contemporary speakeasy inspired space combines seamless indoor outdoor living with premium functionality. Featuring a Kaboodle kitchen with extensive storage, double ovens, dishwasher and bespoke joinery, the venue is designed for effortless entertaining. A Yamaha 7.2 in-ceiling surround sound system, Bose outdoor speakers and Samsung 98-inch display create an immersive experience. A new bathroom provides convenient access from both indoor and outdoor areas, while the 90sqm outdoor entertaining space, complete with Kaboodle cabinetry, Brazilian marble benchtops and a 25sqm fire pit platform, delivers the ultimate hosting destination.
- Materials:
18mm MDF for ceiling and walls.
90x45 primed timber framing
Kaboodle joinery and bench tops, panels for gaps and benches
Electrical cable, fittings and outlets, under bench led strip lighting
Tile glues and floor fixings
V Board for wall lining
Thousands of screws, nails and fixings
Wall and ceiling insulation
External roller blinds
Fire pit
Picture hanging products
Timber wall panelling,
Pine 90x25 timbers for custom ceiling
Dulux paint for walls and ceilings
Tap and plumbing fittings for kitchen and shower areas
Locks and hardware for doors
Water proof snake, ceiling insulation blanket
Waterproofing
Hardies cement panels
Aluminium pool fencing and fluted cladding
120mm skirting
Gyprock sheets
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
- Tools:
Dewalt - drop saw, angle grinder, circular saw, nail guns, hammer and standard drills, impact drivers, reciprocating saw, bench saw, blower and vacuum cleaner
Paint brushes and rollers
Tile glues, liquid nails, silicone
Hand tools, hammers, screwdrivers, box cutters, saw, hack saw, socket set, pliers, side cutters
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
Search results - Bunnings Australia
- Step 1:
Project Scope - Design Phase
Design and Construct a premium entertainment precinct incorporating a speakeasy style bar, lounge and relaxation area, fully equipped kitchen, bathroom, toilet and shower facilities. Given the site's slope and varying ground levels of 500mm to 1.2m, careful consideration was given to creating seamless flow between the indoor and outdoor spaces. The outdoor entertaining area was constructed level with the existing internal slab to maximise accessibility and connectivity.
The project required approximately 25 tonnes of fill and 30 tonnes of concrete. Engineered footings, reinforced with Rio bar and 400mm deep foundations, were installed to ensure long term structural stability. Electrical and plumbing requirements were carefully assessed to support the kitchen, bathroom and entertainment systems. Working closely with the Bunnings team, Kaboodle kitchens, benchtops and cabinetry solutions were designed to achieve a bespoke, functional and buildable outcome.
- Step 2:
Materials List, Availability and Lead Times
Working with the Special Orders team at Bunnings, we finalised the materials schedule and Kaboodle designs for the kitchen, bar and outdoor cabinetry. Early planning and ordering ensured product availability, managed lead times and kept the project on schedule, with materials delivered as required throughout the build.
- Step 3:
Costings and Financial Investment (Minister for Finance Approval – Wife)
Builder quotes for the project ranged from $280,000 to $300,000. By undertaking the project ourselves and leveraging the expertise of Bunnings Trade and Special Orders, we reduced the total project cost to $175,210.50, excluding only the licensed electrical, plumbing and concrete works. This delivered a saving of approximately $104,789.50 compared with the lowest commercial quote.
- Step 4:
Plumbing, Electrical and Concrete Slabs
Obtained quotes and engaged licensed trades for the electrical, plumbing and concrete works. Friends with carpentry experience assisted with framing and general labour, helping keep costs under control. A combination of mates’ rates, hard work, BBQs and refreshments helped bring the project to life.
- Step 5:
Project Timeline, Scope and Schedule
As the project was largely completed ourselves and restricted to weekends, a five-month timeline (approximately 45 working days) was established. The schedule covered all major stages including framing, concrete works, tiling, plumbing, electrical installation, cabinetry and finishing works. Careful planning, supported by the Bunnings team, ensured materials and trades aligned with each phase of the build, keeping the project on track.
- Step 6:
Materials Ordering and Delivery
Materials were ordered from Bunnings 7–10 days in advance to align with each stage of the build. Deliveries arrived on time and directly to site, helping maintain project momentum. The Bunnings team provided regular updates on Special Orders and lead times, while PowerPass made tracking orders, materials and project costs simple and efficient throughout the build.
- Step 7:
Demolition and Site Preparation
Demolition and site preparation commenced to ready the space for construction and incoming materials. Works included removing existing gyprock, power and data cabling, garage and side access doors, grinding the existing slab, and creating new openings for the installation of large sliding doors. This phase established a clean foundation for the transformation of the former garage into the entertainment precinct.
- Step 8:
Framing and Construction
Weekly Bunnings deliveries were scheduled ahead of each weekend's work, ensuring materials were available when needed. Construction commenced with framing the walls and the highly customised feature ceiling, which required three weekends to complete due to its complexity and detail. Careful planning, reliable deliveries and proactive management of lead times ensured the project progressed without delays.
- Step 9:
Project Completion
The project was completed on schedule, requiring only a few final value-add items from Bunnings. The transformation exceeded expectations, with family, friends and visitors continually amazed that the entire precinct was built and how it was built. The bespoke finishes, attention to detail and seamless functionality have created a space that is enjoyed and used every day.
- Step 10:
The Finished Result
The standout feature of the project is the Kaboodle kitchen, bar, entertainment unit and outdoor kitchen, which visitors are often surprised to learn came from Bunnings. Working closely with the Bunnings team, our ideas were transformed into a bespoke and highly functional entertainment space featuring extensive storage, custom cabinetry and striking under bench LED lighting. The finished result exceeded expectations, delivering a premium look and feel that has inspired others to seek our assistance in designing and managing their own dream renovation projects.