To create a functional bathroom from an existing unusable storeage area within a lower level garage.
It seemed somewhat overwhelming at the start but once approvals were obtained, and a step by step plan developed, the project started. All first fix plumbing and electrical wiring was performed by qualified trades which left the remaining tasks and fitout to be completed by myself……and the fun began!!
Materials and fitout items listed below:
https://www.bunnings.com.au/dulux-4l-interior-paint-wash-wear-plus-kitchen-bathroom-low-sheen-vivid-white-4l_p1370128
https://www.bunnings.com.au/bastion-wet-area-waterproofing-12-5kg-5080_p0612562
Along with the usual suspects (eg: hammer, screwdrivers, wrenches, allen keys), specific tools were required to perform all the necessary tasks as listed below:
https://www.bunnings.com.au/makita-18v-hammer-driver-drill-dhp482z-skin-only_p6240342 https://www.bunnings.com.au/makita-18v-brushless-multi-tool-dtm52zx3-skin-only_p0293201 https://www.bunnings.com.au/makita-18v-115mm-slide-switch-angle-grinder-dga452z-skin-only_p6240142 https://www.bunnings.com.au/makita-18v-165mm-circular-saw-dss611z-skin-only_p6240302 https://www.bunnings.com.au/ozito-1600w-210mm-8-corded-compound-mitre-saw_p0025645
Gyprock the ceiling and frame up a wall prior to first fix plumbing.
Plumbing complete with hot/cold and drainage.
Installed wet wall sheeting, waterproof flooring and shower base.
Now for the tricky bit, install shower screen, toilet and vanity.
Hi @Lev61,
Welcome to the Bunnings Workshop community, it is brilliant to have you with us.
Thank you for sharing your new bathroom project. It is really interesting looking between those first two images to see just how drastic a change there is.
You haven't mentioned it, but I imagine it was messy work to install the floor drain and drain for your shower. Retrofitting wastes in a concrete slab is no small task and adds some real complexity to a job like this. Your plumber has done a great job there.
In the end, the space looks clean, modern and functional and I'm sure it is a welcome addition to your home.
Congratulations on a job well done and thank you for sharing.
Jacob
Hi Jason,
Thank you for your thoughts on the project as it is much appreciated. Yes, during the install of the drainage plumbing it certainly was messy and was glad once completed (I should have added that photo). The project did take a bit longer than anticipated due to having a full shoulder reconstruction halfway through the job but got there in the end. It's now the perfect addition to the "mancave".
Regards Paul