🖼️
The project:
We bought our home nearly two years ago & the ensuite was tired, needing a complete renovation. We stripped it all out. Re-sheeted the walls. Water proofed the floor & walls. Then tiled in magical patterns of pink, mustard & white. Got it plumbed & electrics put in. Instillation of the fittings was so much fun, continuing along the quirky bold theme, diy’ing a mustard vanity & cabinet, with pink retro legs, & adding a pink basin on top. I’m still in love with the finish & smile every time I walk in.
- Materials:
Paint from Bunnings.
Wall tiles from Bunnings
Vanity basin from Bunnings
Cement from Bunnings
Grout from Bunnings
Villa board sheets from Bunnings
Waterproofing from Bunnings
Toilet from Bunnings
Towel rails from Bunnings
Dual shower & vanity fittings from Bunnings
Light fittings that we DIY’d into vanity sconce lights from Bunnings
Heat/ fan lights from Bunnings
Grab rail from Bunnings
Floor waste from Bunnings
Tile trims from Bunnings
Sand from Bunnings
Tile glue from Bunnings
Tile spacers from Bunnings
Silicone from Bunnings
- Tools:
Trowels from Bunnings
Cement mixer from Bunnings
Hammer from Bunnings
Jackhammer from Bunnings
Shovel from Bunnings
Tile cutter from Bunnings
Tile nippers & grinder from Bunnings
Ceramic cutting disc from Bunnings
Cleaning cloths from Bunnings
Ladder from Bunnings
- Step 1:
Stripped out the bathroom completely, including Jack hammering up the exiting tiles.
Re-sheeted the existing walls.
Waterproofed floor & walls
Tiled
Got plumbing & electricals completed
Added accessories including an upcycled vanity, new toilet and shower and vanity fittings. Mirror & DIY’d lights for sconces. Plantation shutters.