The project:
It was time to renovate the laundry in our nearly 50 year old house. The laundry had not been modified since it was built, so it needed a face lift. We stripped everything back to the walls and set about making it a new modern laundry to match the rest of the house renovations we had completed over the last 6 years.
- Materials:
Kaboodle Cabinet Range
https://www.bunnings.com.au/brands/k/kaboodle
Kaboodle Benchtop
https://www.bunnings.com.au/kaboodle-38-x-901-1200mm-salt-pan-double-square-edged-customisable-benchtop_p0609552
Floor Select Blackbutt Hybrid Flooring -
https://www.bunnings.com.au/floor-select-6mm-2-2m-blackbutt-hybrid-waterproof-flooring_p0135656
Betile Mint Green Wall Tile -
https://www.bunnings.com.au/betile-76-x-306-x-8mm-mint-green-gloss-boulevard-ceramic-wall-tile_p0054123
QEP Black Tile Trim -
https://www.bunnings.com.au/qep-8mm-x-1m-black-angle-l-shape-tile-trim_p0194498
Blackest Black Tile Grout -
https://www.bunnings.com.au/davco-2l-blackest-black-ready-to-use-easy-grout_p0066345
Timber -
https://www.bunnings.com.au/90-x-45mm-outdoor-framing-h3-treated-pine-2-4m_p8032172
Fibre Cement Board -
https://www.bunnings.com.au/durasheet-2400-x-1200-x-6mm-2-88sqm-fibre-cement-cladding_p0710090
Concrete -
https://www.bunnings.com.au/westbuild-20kg-kwikset-concrete_p0760207
Tap -
https://www.bunnings.com.au/mondella-resonance-35mm-matte-black-coil-multi-function-sink-mixer_p0684026
- Tools:
https://www.bunnings.com.au/qep-1-5mm-t-shape-tile-spacers-100-pack_p6821892
https://www.bunnings.com.au/bastion-15kg-premixed-tile-adhesive_p0612173
https://www.bunnings.com.au/dta-15mm-bright-steel-notch-trowel_p6820097
https://www.bunnings.com.au/ramset-8-x-40mm-nylon-ramplug-anchor-8-pack_p2260656
https://www.bunnings.com.au/bremick-10g-x-40mm-t25-b8-fibre-cement-screw-100-pack_p0920652
All other tools I already had.
- Step 1:
First step was clearing the room and removing all the old cabinetry, basin and tapware.
- Step 2:
The next steps was relocating the taps for the sink to below cabinet level. The existing taps for the washing machine and dryer was also blanked off. We also removed the exit door to the backyard as we never used it and wanted to reclaim the space for extra benchtop/cabinets. Also filled the recess from the old basin with concrete so that it was level with the rest of the floor.
- Step 3:
Once the services was relocated we could then start installing the floor and wall cabinets as well as the benchtop.
- Step 4:
Once the floor and wall cabinets were in, and we put on the cabinet doors, the next step was flooring. We laid the floating hybrid floor directly over the existing tile. It was a good choice and saved and lot of time, money and mess.
- Step 5:
Once the floor was in, the next step was installing the tiles. Once the tiles were on we finished with grouting and trim. During this step we also relocated the power outlet to below the cabinet.