Hello
I'm looking to install some ceiling mounted curtain tracks. Theres a few joists thats running cross where I want to put the track, however theres a bit of a gap between the plaster and the wood itself.
Since there is a gap and the joist doesn't sit directly flush on the plaster, should I be using longer wood screws and attach directly onto the joists? Should I be using wood screws? If so do I need to predrill into the joist?
Or is it a better idea to attach some side beams on the underside so it sits flush on the plaster and directly attach to that?
Thanks