Hi everyone
Currently in the final steps of a bathroom reno.
The old shower base was a thick solid porcelain unit (1996 house) and when removed it’s covered a 300mm deep cutout in the slab for the drain.
The new base is a Mondella 900x900 Torbex unit. The plumber who installed the base didn’t back fill the hole as he said it wasn’t necessary. There’s now a hollow sound around the drain and it also has a bit of flex.
Is this going to cause issues?
The tiles are not yet grouted and the shower screen is not installed. Should it be ripped up and the hole filled?
Thanks in advance