I've been doing a DIY on my shower which required me to pull out the walls and to check behind them for water issues. Have had mold treated and plumber come out to properly check the pipes.
My issue is I think I've used the wrong joint compound on the new used to join them with the existing one. I have used
https://www.bunnings.com.au/gyprock-csr-20kg-base-coat-45_p0731156
Looking over it again now I believe I should have used the purple one. I have only done one coat at the moment and wanting to know if I have to sand down as much as possible and add two layers of the proper wet area coats to fix what I've done or does it all have to come out?