The project:
Deck built 17years ago. Subframe and deck surface deteriorated. Decided to rebuild bearers and joists (resealing all cuts with wood preservative), using bearer tape and finishing with Ecodeck. The finish is zero maintenance and the frame will last 20 years.
- Materials:
90x45 timber pressure treated and cuts sealed
Bearer tape
Ecodeck and their fixing system for 3mm gap
Pedestal feet
Bugle screws and nails
- Tools:
Drop saw and stands
Drills and bits
Nail gun
Jigsaw
Spirit level
Laser level
Lump hammer
Rasp
- Step 1:
remove old and damaged deck
- Step 2:
Build new sub frame bearers and joists
- Step 3:
Lay new decking in three picture framed sections
- Step 4:
Dispose of old materials and waste from new build